Construction Cost Calculator Pakistan 2026 (5 Marla, 10 Marla, 1 Kanal Grey Structure + Finishing + Turnkey)
Free construction cost calculator for Pakistan houses. Get instant grey structure, finishing, and turnkey estimates per marla / sqft with material breakdown (cement bags, saria kg, bricks) across Lahore / Karachi / Islamabad at 2026 rates.
About the Construction Cost Calculator Pakistan 2026 (5 Marla, 10 Marla, 1 Kanal Grey Structure + Finishing + Turnkey)
Pakistan's most complete house construction cost calculator with verified July 2026 rates. Enter your plot size (3 Marla / 5 Marla / 7 Marla / 10 Marla / 1 Kanal / 2 Kanal or custom covered area), storey configuration (single / double / triple), construction quality tier (Economy / Standard / Premium / Luxury), and city (Lahore / Karachi / Islamabad-Rawalpindi / Faisalabad / Multan / Peshawar / Pakistan average). Get an instant breakdown showing grey structure cost, finishing cost, total turnkey estimate, cost per marla, cost per sqft, and full material requirements (cement bags at Rs 1,350/bag, 60-grade saria at Rs 305/kg, fired bricks at Rs 22/unit, river sand at Rs 65/cft, crush at Rs 105/cft). Quality tier comparison table shows Economy at Rs 2,800/sqft grey vs Luxury at Rs 4,200/sqft grey. Covered area auto-calculated using industry standard 80 percent ground floor + 60 percent first floor + 50 percent second floor plot coverage, with override for custom designs. Rates cross-verified against Avenir Developments, HA Design Studio, Glorious Builders, Grey Structure Calc, and Shelters Engineering 2026 rate databases. Perfect for homeowners planning construction, real estate agents estimating listing prices, and property investors comparing project budgets before signing BOQ contracts.
Rates last verified: 2026-07-17
Construction rates in Pakistan float 3-5 percent month to month with cement, steel, and sand commodity pricing. Estimate is for planning only. Always get 2-3 vendor BOQ quotations before signing a contract, and confirm with a PEC-registered civil engineer for structural specifications.
Auto uses 80 percent GF + 60 percent FF + 50 percent SF plot coverage. Override if your design differs.
| Material | Quantity | Rate (approx) | Cost |
|---|---|---|---|
| Cement | 677 bags | Rs 1,350 / bag | Rs 913,950 |
| Steel (60-grade saria) | 6,615 kg | Rs 305 / kg | Rs 2,017,575 |
| Fired bricks | 55,125 units | Rs 22 / unit | Rs 1,212,750 |
| River sand | 2,520 cft | Rs 65 / cft | Rs 163,800 |
| Crush / gravel | 1,890 cft | Rs 105 / cft | Rs 198,450 |
| Core materials subtotal | Rs 4,506,525 | ||
Material rates are Lahore market averages July 2026. Actual dealer rates vary by 5-10 percent by city and bulk order size. This is approximately 55-65 percent of grey structure cost; the remaining 35-45 percent is labour, formwork, plumbing pipes, electrical conduits, and paint. Get a full BOQ from a PEC-registered civil engineer before signing a construction contract.
| Tier | Grey / sqft | Finishing / sqft | Turnkey Total |
|---|---|---|---|
| Economy | Rs 2,800 | Rs 2,000 | Rs 75.6 Lakh |
| Standard(selected) | Rs 3,200 | Rs 3,200 | Rs 1.01 Crore |
| Premium | Rs 3,600 | Rs 5,000 | Rs 1.35 Crore |
| Luxury | Rs 4,200 | Rs 8,000 | Rs 1.92 Crore |
How to use the Construction Cost Calculator Pakistan 2026 (5 Marla, 10 Marla, 1 Kanal Grey Structure + Finishing + Turnkey)
- Pick your plot size: choose from 3 Marla, 5 Marla, 7 Marla, 10 Marla, 1 Kanal, or 2 Kanal. Or enter your exact covered area in the override field.
- Select storey / floors: Single (Ground Floor only), Double (GF + First Floor), or Triple (GF + FF + SF). Auto covered area updates instantly using standard plot coverage rules.
- Choose construction quality tier: Economy (Rs 2,800/sqft grey), Standard (Rs 3,200), Premium (Rs 3,600), or Luxury (Rs 4,200/sqft grey). Each tier shows the exact material and finishing specs.
- Pick your city: Lahore (base rate), Karachi (+2%), Islamabad / Rawalpindi (+5%), Faisalabad (-6%), Multan (-8%), Peshawar (-4%), or Pakistan average (-5%).
- Toggle Grey Structure Only vs Turnkey: grey structure only shows shell cost, turnkey adds finishing (tiles, doors, sanitary, paint, electrical fittings).
- Read the results: total estimated cost, cost per sqft, cost per marla, full material breakdown (cement bags, saria kg, bricks, sand, crush) with individual rates, and a side-by-side tier comparison at your selected size.
- Cross-verify: use the material breakdown to shop dealer rates locally. Get 2-3 BOQ quotations from PEC-registered civil engineers before signing a construction contract.
Frequently Asked Questions
Related Reading
Related Tools
Discover more free tools
Toolsfluent has dozens of fast, privacy-friendly tools that work right in your browser. Explore by category to find what you need.
Browse all tools →